CITROEN C6 Technical Information Seite 68

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 223
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 67
62
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: DT17BTED4
Remove:
- The air duct between the air/air exchanger and the air inlet housing (6).
- The air inlet housing (6).
Uncouple, plug and move aside the pipes (2) and (3) using tool [1].
Detach and move aside the electrical harness.
Remove:
- The header tank fixing (1).
- The "Swirl" electrovalve fixings (7).
Move aside:
- The "Swirl" electrovalve (7) with its support.
- The header tank (1).
Position the lifting bracket [6] at "a".
Support the engine by means of a workshop hoist.
Remove:
- The upper RH engine support tie bar, and the upper RH engine support (5).
- The engine support (4) on the chassis member.
- The accessories drive belt (8) (see corresponding operation).
- The engine support (12), the crankshaft pulley (9), the upper timing covers (11).
- The lower timing cover (10).
Line up one of the three holes "b" on the pulley with the hole on the body of the coolant pump.
Immobilise the coolant pump pulley, using tool [6].
Remove the coolant pump pulley (13).
B1BP3C2D
B1EP1JDD
Angl-C6-page022-82-2005 4/02/05 17:19 Page 62
Seitenansicht 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 222 223

Kommentare zu diesen Handbüchern

Keine Kommentare